ADD: 47-8 HuangZhou Road, Huangyan, Zhejiang,
China
English hot line:
0086-576-84020122
Arabian hot line:
0086-576-84020199
Chinese hot line:
0086-576-84020122
Cell Phone:
0086-13586002000
Fax:
0086-576-84020107
Web Site:
http://www.mega-machinery.com, http://www.megamould.com
E-Mail: hymega@gmail.com

Products
 
MG-PP2000 automatic stretch blow molding machine
* Brief introduction

Advanced PLC controls MG-PP 2000 automatic bottle stretch blow molding machine, the whole bottle production from preform conveying to bottle taking off is completed automatically, with labor saving and no pollution. MG-PP 2000 concludes three main parts: preform loading system, Heater channel & blow station. MG-PP 2000 is designed by European CE symbol and measured up to ISO9001 standard, which provides guarantee for the quality of the products.
* Control system

The control system is the key of MG-PP 2000 automatic blow molding machine. Together with HITECH Man-Machine Interaction (MMI) control panel with user-friendly, the whole control system presents super performance with precise control, convenient parameter setup, obvious display and reasonable memory.

* Pneumatic system

Pneumatic system provides the power for MG-PP 2000's movement. World famous high quality pneumatic components are equipped on MG-PP 2000 such as Festo from Germany. High precise action, long service life and reliable performance are their highlights. Those pneumatic components suppliers' global service network provides customer their prompt after-sale service locally for their pneumatic products used on MG-PP 2000.
* Sensor system

MG-PP 2000 adopts high quality imported sensor & switch system including proximity switch, photoelectric switch, electronic magnet switch to keep production process going step by step and avoid possible damage on machine.
* Heating system

In consideration of PP property, MG-PP 2000 automatic stretch blow molding machine adopts specially designed long baking tunnel and infrared type heating mode, whose superior thermal-radiation and thermal penetrability provide machine with powerful heating to meet strict preform heating requirement under speedy moving. Infrared heating lamps placed onto three heating zone with sets of independent voltage adjusting module and advanced microcomputer controller, can offer ideal heating for preform of different size. The horizontal position of each lamp's is adjustable to keep the machine flexible.
* Clamping system

MG-PP 2000 adopts three-plate type toggle clamping unit to provide powerful clamping force. Apart from the three-plate type toggle clamping unit, there is a high pressure assistant clamping device that is special designed to get a firm clamping.
* Preform feeding & bottle discharging system
MG-PP 2000 automatic stretch blow molding machine is equipped with automatic prefrom loading system, which protect the neck of the perform from possible damages. The heated preforms are blown with neck up so as to ensure the quality of the finished bottle, and then shaped bottles will automatic fall down during the machine' movement.
* Operation

The standard MG-PP 2000 operation contains four steps following:
Step 1. Put the preform into preform container and the conveyer will take the preform to orientation units automatically.
Step 2. Load the preform with neck up to preform holder, and then preform is conveyed into baking tunnel.
Step 3. After heating, preform is conveyed into the blow station, then close the mold, stretch and blow under low pressure and high pressure, exhaust, open the mold.
Step 4. The finished bottle is taken off by automatic discharging system.
China MG-PP2000 automatic stretch blow molding machine Factoryblow molding machine

 
© 2010 China Zhejiang Taizhou HuangYan Mega Machinery Mold Co., Ltd. All Rights Reserved. Powerby China Products & China Manufacturers
Site Map, Site Map Friendly Links Add Your Links
Chinese Portuguese English Japanese German Arabic Spanish Russian French